Corridor H, West Main Street, East Main Street
Eastbound Views
Between the two sections of Corridor H, US 48 is temporarily routed along Parsons Road (US 219), Seneca Trail (US 219), Appalachian Highway (WV 32), and Synergy Highway (WV 93).
The eastern section of Corridor H begins in Davis as Synergy Highway (WV 93) widens to become a four-lane divided highway. The speed limit goes up to 65 MPH. WV 93 is multiplexed with US 48 along Corridor H for a few miles here.
Photos taken October 2023.
There is an uncontrolled at-grade intersection at Forestry Camp Road and Industrial Park Access Road (CR 93/1).
Photos taken October 2023.
Corridor H runs east as a four-lane divided highway. There are uncontrolled at-grade intersections at Riverstone Road, Frostfang Drive, Remington Drive, East Portal Road, A Frame Road, and Buffalo Coal Road.
Photos taken October 2023.
Al Brown Road (CR 90/1) begins on the left as Corridor H crosses the Eastern Continental Divide.
Photos taken October 2023.
WV 93 splits off to the right onto Power Station Highway. Corridor H continues straight ahead as US 48 alone.
Photos taken October 2023.
There is an exit for Power Station Highway (WV 93).
Photos taken October 2023.
There is an uncontrolled intersection at Communications Drive. Turn left for access to Union Highway (WV 42).
Photos taken October 2023.
The highway slopes down at a fairly steep grade. Near the bottom, there is a runaway truck ramp.
Photos taken May 2016.
Turn right here for Laurel Dale Road (WV 93).
Photos taken May 2016.