Cross Bronx Expressway, Bruckner Expressway, New England Thruway
Northbound Views
Exit 15 is for Boston Post Road (US 1).
Photos taken October 2019.
Exit 16 is for North Avenue (CR 81) and Cedar Street.
Photos taken October 2019.
Exit 17 is for Chatsworth Avenue. All motorists must pay a toll at this point. There is a cashless tolling gantry just past the exit, as well as a second gantry on the exit ramp.
Photos taken October 2019.
Exit 19 is for Playland Parkway.
Photos taken October 2019.
Exit 20 is for Boston Post Road (US 1) south. Exit 21 is for the Cross Westchester Expressway (I-287) and Boston Post Road (US 1) north.
Photos taken October 2019.
The Cross Westchester Expressway (I-287) merges in from the right.
Photos taken January 2024.
There is small bridge across the Byram River to Connecticut. The New England Thruway ends at the state line. I-95 continues into Connecticut as the Connecticut Turnpike. There is advance signage for the first exit in Connecticut before the bridge.
Photos taken January 2024.