Southbound Views
Exits 9W-E are for I-84.
Photos taken September 2020.
The highway narrows down to a single lane in this direction just south of exits 9W-E until the ramps for I-84 merge in.
Photo taken September 2020.
There is a long gap between exits just south of I-84.
Photos taken August 2013.
Exit 8 is for Hardscrabble Road (CR 138).
Photos taken August 2013.
Exit 6 is for Cross River Road (NY 35).
Photos taken August 2013.
Exit 5 is for NY 117 and the Saw Mill Parkway.
Photos taken September 2020.
There is a text stop, rest area, and truck inspection station south of exit 5.
Photos taken July-September 2020.
Exit 4 is for South Bedford Road (NY 172).
Photos taken July 2020.
Exit 3 is for Bedford Road (NY 22).
Photos taken July 2020.
I-684 continues south toward the border with Connecticut.
Photos taken July 2020.
Welcome to Greenwich, Connecticut! I-684 crosses into the state for about a mile before returning to New York. There are no exits in Connecticut, and the road is still maintained by NYSDOT.
Photos taken July 2020.
Exit 2 is for Purchase Street (NY 120).
Photos taken July 2020.
Exit 1 is for the Hutchinson Parkway south. It is a left exit. I-684 ends ahead at the Cross Westchester Expressway (I-287). Use the right lane to go west or the center lane to go east.
Photos taken July 2020.
The roadway splits. Bear left to go east on the Cross Westchester Expressway (I-287). Bear right to go west and for Westchester Avenue (CR 62).
Photo taken July 2020.